Dalian Shipyard have awarded the Ti Group 7 off Type B Fuel tanks with “TiG Type B Panel Design. The tank will contain 13,000cbm of LNG Fuel with 400mm thick EPS insulation. Design is complete and manufacture will commence at Ti China facility in Shanghai. Installation will complete by 2023-2024 at Dalian Shipyard, Dalian city, Niaoning province, China